Needed a EV charger and consumer unit installing and certifying etc that I supplied.
We recently received a call from a landlord who was understandably worried.
His rental property was about to be let, but he had realised that he did not have an up-to-date Electrical Installation Condition Report, usually called an EICR.
With a tenancy approaching, he wanted to get everything sorted quickly. It is an easy situation to find yourself in when you are organising repairs, decorating, dealing with a letting agent and preparing a property for new tenants.
For landlords in Newton Abbot, our advice is straightforward: check your electrical inspection paperwork early and book ahead. If you have discovered a missing or expired report, contact a qualified electrician promptly so you can establish what needs doing and agree a realistic plan.
Missing EICR Paperwork: Start by Checking What You Have
The first step is to establish whether there is an existing report and when the next inspection is due.
An EICR records the condition of the fixed electrical installation at the time of inspection. This includes items such as the consumer unit, wiring, sockets and lighting circuits.
Before arranging an appointment, find your previous report if you have one. Check the recommended date for the next inspection and whether any observations required further investigation or remedial work. Keep any certificates relating to subsequent repairs with it.
Having that information available helps your electrician understand the situation. It also avoids treating a missing copy of a document as though no inspection has ever taken place.
Is Booking an EICR Enough Before a New Tenancy?
This is an important distinction. Arranging an appointment is a useful first step, but a booking confirmation does not replace the inspection or extend the deadline.
For a rental property in England without a current report, the required inspection and testing must take place before the new tenancy begins. The landlord must also supply the report to the new tenant before they occupy the property.
That means a booking several weeks after the planned tenancy starts should not be treated as permission to proceed.
There is no need to panic, but there is a need to act. Explain the proposed tenancy date when you enquire, provide the previous paperwork where available and find out whether the necessary inspection can be completed in time. If it cannot, the letting arrangements may need reviewing.
Why We Recommend Booking Your Newton Abbot EICR Early
At A.M Electrics Devon Ltd, we tend to be booked around three to five weeks ahead. I am the electrician carrying out the work, so the diary has to allow time for existing commitments, proper testing and the paperwork afterwards.
Booking ahead gives you more choice over dates and makes it easier to arrange access, particularly if a tenant is still living at the property.
It also leaves breathing space if the inspection identifies something that needs attention. An EICR is an assessment of the installation’s condition; a satisfactory result cannot be promised before the inspection takes place.
For a planned change of tenancy, it is sensible to contact us well before the property needs to be ready. Tell us the important dates at the outset so we can give you an honest answer about availability.
What Happens During the Inspection?
An EICR involves visual inspection and electrical testing, with the extent and any agreed limitations recorded in the report.
We assess the accessible installation for damage, deterioration and electrical safety concerns. This includes examining the consumer unit, checking earthing and bonding arrangements, and carrying out the relevant circuit tests.
The electricity will need to be switched off during parts of the appointment. Access to the consumer unit, sockets and other relevant equipment therefore needs to be arranged beforehand.
For this particular landlord enquiry, the immediate issue was the missing current report. Until an inspection has taken place, it would be wrong to assume either that the electrics are unsafe or that everything will pass without further work.
Testing, Findings and Any Further Work
Once the inspection is complete, the report explains the findings and whether the installation’s condition is satisfactory or unsatisfactory.
If further investigation or remedial work is required, we explain what has been identified and discuss the next steps. That is another reason to avoid leaving the inspection until the day before tenants are due to collect their keys.
Our aim is to give landlords clear information they can act on, including the report and any relevant certification for work subsequently completed.
Knowing Who Will Turn Up
Some electrical companies can offer same-day appointments. Larger teams, cancellations and different working arrangements can all make that possible.
Availability alone does not tell you whether an electrician will carry out a thorough inspection. Ask who will attend, whether they are qualified and competent to carry out EICRs, what the inspection includes and how any findings will be explained.
With A.M Electrics Devon Ltd, you know who is coming: me, Dan. As an independent local contractor, I value that continuity and the opportunity to build an ongoing relationship with the landlords I work with.
Arrange Your Landlord EICR in Newton Abbot
The best outcome is to have your inspection arranged early, your paperwork ready and enough time available to deal with anything the testing identifies.
If you need an electrician in Newton Abbot, contact A.M Electrics Devon Ltd to discuss your property and proposed tenancy date.
You can also read about our Electrical Installation Condition Reports before booking.
Call 01626 299105 for straightforward advice and our current availability.